Curtain Walling Installation

Curtain walling is usually fitted once the main structure of a building is in place. However, many decisions concerning the façade need to be made well before construction begins. The position of structural columns, thickness of floor slabs, and dimensions of window openings can all influence how the external glazing is fitted.

Leaving these decisions until the later stages of construction can make curtain walling installation unnecessarily complicated. Involving curtain walling contractors during the design stage allows architects, structural engineers, and building contractors to identify potential problems before work begins on site.

The Building Structure And Glazing Must Work Together

A curtain wall does not support the weight of a building, but it must carry its own weight and withstand external forces. The framework is attached to the main structure using brackets and fixings, the positions of which depend on the arrangement of columns and floor slabs. If the requirements for curtain wall installation are overlooked during structural design, additional steelwork or alterations to fixing arrangements may become necessary.

Getting The Glazing Dimensions Right From The Start

Architectural drawings may show large, uninterrupted sections of glass, but manufacturing and installation have practical limitations. The dimensions of individual glass panels affect their weight, thickness, supporting framework, and handling requirements. By establishing the specifications for curtain wall glazing early, designers can determine whether the proposed panel sizes are achievable. Experienced curtain walling contractors can also advise on the positioning of vertical and horizontal framing sections.

Allowing For Movement Within The Building

All buildings experience some degree of movement. Steel expands and contracts with temperature changes, concrete gradually shrinks, and floor slabs may move slightly under loading. During the planning of curtain walling installation, structural movement calculations help determine suitable fixing arrangements and movement joints. Without sufficient allowance, movement could damage seals, distort aluminium profiles or place unwanted stress on the curtain wall glazing.

How Do Glazing Decisions Affect The Building’s Energy Performance?

The amount of glass used across a commercial building influences its heating, cooling, and lighting requirements. A large glazed façade may provide excellent natural daylight, but an unsuitable glass specification could result in excessive heat loss during winter or overheating during summer. Before approving a curtain wall installation, the project team should consider thermal insulation, solar control, and the orientation of the building. Selecting appropriate curtain wall glazing at the design stage allows mechanical and electrical engineers to plan heating, ventilation, and cooling systems more accurately.

Façade Meets The Rest Of The Building

One area that deserves particular attention is the connection between curtain walling and other building elements. These include roofing systems, external cladding, internal partitions, and floor edges. Early involvement of curtain walling contractors allows these details to be discussed before different sections of the building are constructed. Including these requirements in the initial curtain walling installation plans helps avoid difficult remedial work once the facade is in place.

Planning For Repairs Long After The Construction Ends

Future maintenance is easily overlooked when attention is focused on completing a new building. However, cleaning external glass, inspecting seals, and replacing damaged panels can become complicated if suitable access arrangements have not been considered. The initial curtain walling installation plans should account for how maintenance teams will reach different sections of the façade. A carefully planned curtain wall installation can make future maintenance more manageable without requiring extensive disruption to an occupied building.

Curtain walling influences several stages of commercial construction, from structural design to internal finishing and future maintenance. Treating the façade as a separate task towards the end of construction can lead to avoidable alterations, additional expenses, and delays. Establishing its requirements during the initial design stage gives the entire project team a clearer understanding of what needs to be built and how the different elements will fit together.

Frequently Asked Questions

1. Why should curtain walling installation be planned before construction begins?

Planning curtain walling installation early helps coordinate structural requirements, glazing specifications and fixing arrangements, reducing the risk of costly alterations.

2. At what stage should curtain walling contractors be involved in a construction project?

Curtain walling contractors should ideally be involved during the initial design stage to assess structural compatibility, material requirements and installation feasibility.

3. How does curtain wall glazing affect a building’s energy efficiency?

Properly specified curtain wall glazing helps regulate heat transfer, manage solar gain and reduce reliance on heating and cooling systems.

4. What factors should be considered before curtain wall installation?

Before curtain wall installation, project teams should assess structural loads, building movement, glass specifications, fixing arrangements and maintenance requirements.

5. What happens if curtain walling installation is not planned properly?

Poorly planned curtain walling installation can result in structural compatibility issues, manufacturing delays, additional construction costs and reduced thermal performance.